Friday, July 22, 2016

Depot Roof (continued...)

Despite rainstorms and extreme heat waves, our workers have been making steady progress.  The top two photos show the completed dining room roof.  The middle two photos show the second dumpster full of old shingles (on the left) and a pile of shingles stacked up almost to the second floor (on the right). The bottom two photos show completed roofs of the old 1850's depot (on the left) and the railroad express office (on the right).

No comments:

Post a Comment